|
|
|

Annual Timetable
This prescribes the months when work is normally undertaken. It also
gives the priority of each task.
|
|
Essential:
(undertaken at all costs)
|
|
|
Important:
(undertaken as a high priority)
|
|
|
Desirable:
(undertaken if at all possible)
|
|
|
If
Necessary: (undertaken if
required)
|
|
Timetable
|
J
|
F
|
M
|
A
|
M
|
J
|
J
|
A
|
S
|
O
|
N
|
D
|
|
Grazing
Checks
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Water
Level Monitoring
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Equipment
Servicing/Maintenance
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Water
Abstraction (Baker’s Fen)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Wetland
Bird Survey
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Reed
Bed management
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Coppice/Pollard(Adventurer’s Fen)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Water
Abstraction (Reed bed)
|
|
|
|
|
|
|
|
|
|
|
|
|
Breeding Bird Survey
|
|
|
|
|
|
|
|
|
|
|
|
|
Footpath mowing
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Brinking
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sedge
harvest
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Water
Abstraction (Mere)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Drove
cutting
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Godwin
Plots
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Slubbing
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Coppice/Pollard (SedgeFen)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Tree
Health Survey
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Coppice/Pollard
(Burwell Fen)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
J
|
F
|
M
|
A
|
M
|
J
|
J
|
A
|
S
|
O
|
N
|
D
|
|
 |
© National
Trust 2006/7/8/9/10
Wicken Fen, Lode Lane, Wicken, Ely,
Cambridgeshire, CB7 5XP, UK
Tel/Fax: (+44) (0)1353 720274 | Email: wickenfen@nationaltrust.org.uk |
|
|
|